in
 

Browse by Tags

  • Boeings Dreamliner 787 completes power on

    The Boeing Company has completed the Power On sequence for the first 787 Dreamliner, marking the completion of the next major milestone on the path to first flight later this year. Power On is a complex series of tasks and tests that bring electrical power onto the airplane and begin to exercise the...
    Posted to Airliners/Freighters (Forum) by Goose on 06-21-2008
  • Re: Final Assembly Begins on Fifth Boeing 787 Dreamliner

    More from Flightblogger here . According to his sources, the production is going at the fastest pace yet. I think it is about time they set up a head of steam I still think that when this is completed it wil be a kick-ass aircraft. They ae just taking there damn time about it!!!
    Posted to Airliners/Freighters (Forum) by Maverick on 05-02-2008
  • Final Assembly Begins on Fifth Boeing 787 Dreamliner

    --Third Flight-Test Airplane Loaded into First Position -- Final assembly began today on the third flight-test airplane for the all-new Boeing 787 Dreamliner This is the fifth Dreamliner to be loaded into the first position of the 787 production system. The static test airframe moved April 25 from the...
    Posted to Airliners/Freighters (Forum) by Goose on 05-02-2008
Page 1 of 6 (54 items) 1 2 3 4 5 Next > ... Last »
© RBI 2001-2007