Aircraft

DATE:09/05/07
SOURCE:Flightglobal.com
Vought produces two aft sections for first 787

By Stephen Trimble

 

Vought Aircraft Industries has produced two aft fuselage sections for the first Boeing 787, marking another step in the assembly process for the aircraft.

The completed pieces – sections 47 and 48 – will be transported 200 yards to the Global Aeronautica facility, a joint venture by Vought and Alenia North America in Charleston, South Carolina. The completed fuselage section will be then be wrapped and delivered to Boeing’s 787 assembly centre in Everett, Washington.

Vought’s two sections comprise 23% of the fuselage structure, with section 47 measuring 23-feet long and section 48 extending 15 feet. It has been building the two pieces since its production facility opened last June. In total, it has built seven production sections and one developmental section during that period.

Boeing plans to unveil the Boeing 787 factory on 21 May, followed by the ceremonial roll-out of the first aircraft on July 8.

 

Everything about the Boeing 787


James Wallace on Aerospace blog


Rate this article
12345
Poor   Outstanding
Average rating: 3 out of 5

Click here to check out the highest rated articles
 

For exclusive news and expert analysis every week subscribe to Flight International print edition. Included with your subscription are 4 FREE issues and FREE delivery to your home or office.


Buy JP airline-fleets online

JP airline-fleets directory

Be first to get your copy of the 2008/09 edition of JP airline-fleets.

Buy JP airline-fleets online

JP airline-fleets directory

Order your copy of the 2008/09 edition of JP airline-fleets online for the best rates