Flight Home

DATE:04/02/98
SOURCE:Flight International
GE prepares for GE90 growth possibility

Guy Norris/LOS ANGELES

General Electric is to upgrade its GE90 compressor design to reduce fuel consumption by 1.5-2%. Although the move is aimed at the Boeing 777-200IGW (increased gross-weight), the company is preparing for the possibility that a substantial market will develop for future growth versions.

The US engine manufacturer is focusing its improvement drive on advanced three-dimensional aerodynamic design of the ten-stage high-pressure compressor, already based on a scaled version of the GE/NASA energy-efficient-engine compressor design. Software has "-evolved to new levels" since the GE90 was designed, when more ambitious codes were not used because of GE's "risk-abatement" policy, says Dick Ostrom, manager of GE90 integration. The results of the application of the software to the CFM International CFM56-5BP compressor have been encouraging, however, says Ostrom.

Other improvements will include "optimised" blade clearances in the low-pressure compressor (LPC), which were increased after a fourth-stage LPC blade failure in flight tests in 1994. The failure was traced to a "dynamic response problem", which resulted in rubbing. Clearances will also be slightly altered in the fan and the low and high-pressure turbines.

The first improved core will begin test runs at GE's Evendale, Ohio, test site in April, while the first complete-engine test is scheduled for mid-year. Tests on the company's 747 testbed will begin in Mojave, California, "towards the end of the third quarter", says Chuck Chadwell, GE commercial engines operation vice-president.

A higher exhaust-gas temperature margin will enable GE to offer the engine with either a life improvement of 7,000-10,000h on wing, a higher flat-rating or a thrust "bump" up to 418kN (94,000lb)-thrust, says GE. Chadwell says that GE has held off on growth and waited for the market to "sort itself out", but "-if a market for a bigger engine develops, I don't want to do incremental developments - I'd rather have something ready".

Links posted in this story:


Rate this article
12345
Poor   Outstanding
Average rating: This article has not been rated.

Click here to check out the highest rated articles

For exclusive news and expert analysis every week subscribe to Flight International print edition. Included with your subscription are 4 FREE issues and FREE delivery to your home or office.