Defence

DATE:18/04/06
SOURCE:Flight International
Cost overruns put Global Hawk at risk


Pentagon must justify continuing UAV programme

Twenty-five of the USA’s major weapons programmes have experienced “critical” cost growth, although few, if any, face the risk of cancellation. But the US Department of Defense will have to justify continuing the Northrop Grumman RQ-4 Global Hawk unmanned air vehicle programme after it breached cost growth thresholds. The Pentagon has until 5 June to certify that the UAV is vital to national security, no alternatives exist and costs are under control.

Changes in reporting requirements have forced the Pentagon to acknowledge massive growth in projected costs across a wide range of programmes. New rules mandated by Congress require the DoD to report unit cost growth over the original estimate at the time the system entered development, while retaining the requirement to report cost growth over the current baseline estimate.

Cost growth is deemed critical if it exceeds 25% of the current baseline or 50% of the original estimate, and “significant” if it exceeds 15% and 30%, respectively. Under the new rules, 25 of 85 major weapon systems in the DoD’s latest quarterly selected acquisition report have experienced critical cost growth.

Many of the DoD’s major aircraft programmes have experienced unit cost increases over original estimaes of more than 50%, including the Bell H-1 upgrade; Bell Boeing V-22; Boeing C-17, AH-64D and CH-47F; Lockheed Martin F-22 and MH-60R; and Sikorsky UH-60M. Raytheon’s AMRAAM and JSOW missiles and Lockheed’s Advanced Extremely High Frequency and Space-Based Infrared System-High satellites are also listed.

Another 11 programmes have unit costs 30-50% over their ori­ginal estimates. These include Boeing’s F/A-18E/F Super Hornet and C-130 Avionics Modernisation Programme upgrade; Lockheed’s F-35 Joint Strike Fighter and JASSM stealthy cruise missile; Raytheon’s T-6 Texan Joint Primary Aircraft Training System; and Sikorsky’s MH-60S.

Most seriously, the high-altitude, long-endurance Global Hawk UAV’s unit cost is more than 25% over the current baseline estimate, raising the termination threat from Congress. The DoD says correcting design deficiencies and extending development, plus capability improvements, sensor retrofits and quantity increases, pushed the estimated programme cost up by 19% between September and December 2005. The US Air Force says the latest restructuring of the RQ-4B programme, due for DoD approval in May, will set a new baseline.

GRAHAM WARWICK / WASHINGTON DC


Rate this article
12345
Poor   Outstanding
Average rating: 2 out of 5

Click here to check out the highest rated articles
 

On AirSpace now

....and 340 guest(s)

Join us

For exclusive news and expert analysis every week subscribe to Flight International print edition. Included with your subscription are 4 FREE issues and FREE delivery to your home or office.


Huge discount when you post-a-job online!

Flightglobal Jobs

Advertise your jobs on Flightglobal Jobs for just £499 - usually £750! For more information visit our 'For Recruiters' section.

Flight Unmanned E-newsletter

Flight Newsletters

A FREE fortnightly newsletter offering a comprehensive review of news in the sector including exclusive stories, plus links to UAV events and data.