By Justin Wastnage in London
The Sukhoi Su-80GP high-wing commuter turboprop has performed its first flight ahead of a certification flight test programme planned for this year.
The aircraft (82911), powered by two General Electric ST7-9B engines, flew from the Komsomolsk-on-Amur Aviation Association (KnAAPO) runway in Siberia for a brief maiden flight (pictured below). The GP is 1.4m (4ft 7in) longer than the original two prototypes, which have already flown. Sukhoi says the aircraft will perform 15-20 certification flights this year following a series of five first test flights.
|
|
|---|
| |
Production of the first serial aircraft is to begin next year.
....and 244 guest(s)
Join usFor exclusive news and expert analysis every week subscribe to Flight International print edition. Included with your subscription are 4 FREE issues and FREE delivery to your home or office.
Su-80 certification set for 2008
(24/10/06)
Russia grants Alenia 25% stake in Sukhoi
(25/04/06)
SUKHOI BOOST
(28/03/06)
In from the cold
(07/06/05)
Learn how to reach new customers through online advertising and email marketing, drive traffic through SEO and generate new leads online with Flightglobal's 'What Works Online' webinar series
Don’t miss you opportunity to be trained by the experts