To handle the massive amounts of electricity generated by the non-bleed adapted General Electric GEnx-1B engine for the Boeing 787, the engine maker has had to devise an extra large load bank modification for its 747 flying testbed, shown here in detail for the first time.
The engine is capable of generating more than a megawatt of power to meet the ‘more electric’ requirements of the 787 which uses electricity for several systems in place of a conventional pneumatic power system. The load bank, pictured in its belly fairing at GE’s flight test site in Victorville, California, absorbs the energy generated by the engine that would normally be used for systems power in the 787, and converts it into heat.
|
|
|---|
|
|
Click here to subscribe to Flightglobal.com for more industry news and analysis.
Learn how to reach new customers through online advertising and email marketing, drive traffic through SEO and generate new leads online with Flightglobal's 'What Works Online' webinar series
Don’t miss you opportunity to be trained by the experts