Aircraft

DATE:20/03/08
SOURCE:Flight International
Pratt & Whitney readies GTF for second phase of testing

Pratt & Whitney will begin the second phase of ground-testing of its GTF geared turbofan in April at its testing site in West Palm Beach, Florida. In preparation for the testing P&W says the flight inlet and Goodrich-supplied nacelle system have been installed on the GTF demonstrator. Phase two testing is focusing on engine performance, acoustic characteristics and nacelle system validation, it adds. The engine has been selected to power the Bombardier CSeries and Mitsubishi Regional Jet. Ground testing of the GTF began in November 2007, and the demonstrator engine has logged a total of 130h.

GTF





Rate this article
12345
Poor   Outstanding
Average rating: 4 out of 5

Click here to check out the highest rated articles
 

For exclusive news and expert analysis every week subscribe to Flight International print edition. Included with your subscription are 4 FREE issues and FREE delivery to your home or office.


Buy JP airline-fleets online

JP airline-fleets directory

Be first to get your copy of the 2008/09 edition of JP airline-fleets.