Spaceflight

DATE:27/10/08
SOURCE:Flight International
India begins Chandrayaan-2 work

Following the successful launch of India's first lunar orbiter Chandrayaan-1 on 22 October the Indian Space Research Organisation is preparing for its second Moon probe, the Rp4.2 billion ($84 million) lander/rover mission Chandrayaan-2.

This mission is a joint venture with Russia scheduled for 2011-12. It will use the three-stage ISRO Geosynchronous Satellite Launch Vehicle with a cryogenic upper stage to send Chandrayaan-2's lander and rover to the Moon's surface. Russia is to provide the rover.

"We are looking at having a soft landing for Chandrayaan-2 instead of a hard landing. We should be working on technologies that will be part of the proposed Moon base. If we are to become a developed country by 2020, it will be crucial for us to develop such technologies," says ISRO's Chandrayaan-1 project director, M Annadurai, referring to the proposed international lunar outpost expected in the 2020s.

Chandrayaan-2's rover will use a robotic arm to collect samples and conduct in situ analysis of the Moon's soil. Chandrayaan-1 passed the 150,000km (93,000 miles) mark from Earth on 26 October. After its launch ISRO's Vikram Sarabhai Space Centre's projects director S Ramakrishnan said that Mars probe studies have started and that the GSLV could put a 1,000kg (2,200lb) spacecraft into Martian orbit.


Rate this article
12345
Poor   Outstanding
Average rating: 4 out of 5

Click here to check out the highest rated articles
 

On AirSpace now

runlikehell

....and 224 guest(s)

Join us

For exclusive news and expert analysis every week subscribe to Flight International print edition. Included with your subscription are 4 FREE issues and FREE delivery to your home or office.