Lockheed Martin officially launched production on 5 October of the first C-130 Hercules acquired by the US Air Force to support search and rescue missions since the Vietnam War.
The ceremony inside Lockheed's Marietta production facility also marked the launch of a new C-130 variant tailored for special operations missions, which company officials hope could lead to dozens - if not hundreds - of new orders by domestic and foreign customers for the 55-year-old tactical airlifter.
The USAF plans to acquire 22 new HC/MC-130Js to begin replacing 78 HC-130s flown by search and rescue teams and 37 MC-130s operated by special forces. More orders are expected to follow as the USAF continues to renew the ageing fleet.
© Michael Balter MBAviation-Images |
The new design boosts the C-130J's maximum take-off weight to 74,400kg (164,000lb) and the assault landing weight to 64,400kg. The heavier model also includes an advanced wing design that guarantees longer service life, which has become a major issue for the C-130E models that the C-130J replaces.
Lockheed has also adapted the C-130J production process for the new variant. The refuelling receptacle is produced in-line instead of as a post-production modification. That single change eliminates eight months of extra production time, saving $8 million in manufacturing costs per aircraft, Lockheed officials say.
Lockheed has also fitted a forward looking infrared (FLIR) turreted pod - the Raytheon multi-spectral targeting system (MTS-A) - to the airframe structure beneath the flightdeck. The company is investing internal funds to design a retractable turret that could extend the HC/MC-130J's mission radius.
Company officials have also disclosed internal plans to develop a new outer-mould line for the venerable airlifter that can accommodate more equipment for special operations missions. One design concept displayed publicly so far reveals an enlarged nose section and a wider cross-section for the fuselage.
Lockheed is in the midst of a major sales boom for the C-130J programme. The company is doubling annual production from 12 aircraft in 2008 to more than 24 aircraft in 2010. Lockheed will be building five different models of the C-130J simultaneously in 2010, including new HC/MC-130Js and KC-130Js, and C-130J-30s ordered by Canada, Qatar and India.
For exclusive news and expert analysis every week subscribe to Flight International print edition. Included with your subscription are 4 FREE issues and FREE delivery to your home or office.
Learn how to reach new customers through online advertising and email marketing, drive traffic through SEO and generate new leads online with Flightglobal's 'What Works Online' webinar series
Don’t miss you opportunity to be trained by the experts