Aircraft

DATE:23/07/07
SOURCE:Flight International
Lockheed fixes F-35 glitch after power failure

Lockheed Martin expects to conduct the next flight of its first F-35 Joint Strike Fighter in mid-August, after introducing a design fix required after a brief power failure cut short aircraft AA-1's 19th test sortie in early May.

Revealing that the problem arose during a full stick roll at 40,000ft (12,200m), Lockheed's general manager, F-35 programme integration Tom Burbage says: "This was a first-time issue in flight, but a technical solution has been sorted."

The fix will be made to AA-1 before its next flight, and to the two short take-off and vertical landing F-35B flight-test aircraft now on the company's Fort Worth final assembly line in Texas.

Speaking at the Royal International Air Tattoo at Fairford in the UK on 14 July, Burbage said AA-1's flight envelope has been expanded to allow the aircraft to achieve supersonic flight "within the next few months", and added: "The [Pratt & Whitney F135] engine is performing better than we had modelled, so that gives us more margin for weight."




Links posted in this story:

For exclusive news and expert analysis every week subscribe to Flight International print edition. Included with your subscription are 4 FREE issues and FREE delivery to your home or office.


FREE Online Marketing Training

Learn how to reach new customers through online advertising and email marketing, drive traffic through SEO and generate new leads online with Flightglobal's 'What Works Online' webinar series

Don’t miss you opportunity to be trained by the experts

Huge discount when you post-a-job online!

Flightglobal Jobs

Advertise your jobs on Flightglobal Jobs for just £499 - usually £750! For more information visit our 'For Recruiters' section.

 
 
Advanced Search