Aircraft

DATE:20/03/08
SOURCE:Flightglobal.com
PICTURE: Pratt & Whitney readies GTF for second phase of testing

Phase II ground testing of Pratt & Whitney’s (P&W) geared turbofan engine (GTF) set to power the Bombardier CSeries and Mitsubishi Regional Jet is scheduled to begin next month at the manufacturer’s testing site in West Palm Beach, Fla.

In preparation for the testing P&W says the flight inlet and nacelle system have been installed on the GTF demonstrator. The nacelle system, supplied by Goodrich, was installed during a fit check before P&W connects final test sensors and the engine returns to the test stand.

Specifically, Phase II testing is focusing on engine performance, acoustic characteristics and nacelle system validation.

P&W VP next generation production family Bob Saia says data from Phase I testing surpassed pre-test predictions in every major area, demonstrating the fuel burn, noise and emissions characteristics of the new architecture.

In the GTF the fan operates independently of the low-pressure compressor and turbine, which P&W says results in greater fuel efficiency and a slower fan speed for less noise.

Ground testing of the GTF began in November 2007, and the demonstrator engine has logged 130 hours since then.

Previously, P&W has said ground testing is scheduled to continue to May when the when the GTF demonstrator will be installed on P&W's Boeing 747 engine testbed for flight testing.


Source: Air Transport Intelligence news

Links posted in this story:

Click here to subscribe to Flightglobal.com for more industry news and analysis.


FREE Online Marketing Training

Learn how to reach new customers through online advertising and email marketing, drive traffic through SEO and generate new leads online with Flightglobal's 'What Works Online' webinar series

Don’t miss you opportunity to be trained by the experts

 
 
Advanced Search