« KC-X protest - Boeing still thinking | Main | KC-X protest - Boeing decides to file »

KC-X protest - Boeing building up steam

Boeing has just issued a "tanker factors" backgrounder [download file] giving its take on the US Air Force's assessment of its KC-X tanker bid against the five evaluation criteria. It suggests Boeing is narrowing in on reasons for protesting the award of the contract to Northrop and Airbus. Basically it says:

Mission capability: Boeing's bid had "significantly more strengths" than Northrop's;

Proposal risk: Northrop/EADS's plan to assemble and complete the A330 tanker in the US "should have been assessed greater risk";

Past performance: Both were rated satisfactory, but revelant programmes for Airbus - Australia's KC-30 tanker and the A400M - "are struggling";

Cost/price: US Air Force adjustments to Boeing's "significantly lower" cost estimate deprived it of the benefit of its in-line production approach;

Integrated fleet aerial refuelling assessment: Northrop developed the analytical model used by the USAF and changes to the model "before and after RFP release" allowed a larger aircraft to compete.

It's getting very interesting...

TrackBack

TrackBack URL for this entry:
http://www.flightglobal.com/cgi-bin/mt/mt-tb.cgi/23212

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

ADVERTISING

About

This page contains a single entry from the blog posted on March 10, 2008 8:36 PM.

The previous post in this blog was KC-X protest - Boeing still thinking.

The next post in this blog is KC-X protest - Boeing decides to file.

Many more can be found on the main index page or by looking through the archives.