Subscribe by E-mail

Google Translate

Recent Assets

  • asteroid double Orion.jpg
  • wk2 cables closeup.JPG
  • Administrator WK2_FAA.JPG
  • side to rudder compressed.JPG
  • urm1 test.jpg
  • all video blog post pic.JPG
  • F9QualTank2.png
  • will whitehorn w560.JPG
  • WK2 Branson is seated.JPG
  • WK2 interior rear.JPG

Hearings postponed, Ares I structural questions, new uses for Ares V and J-2X consternation

| | Comments (0) | TrackBacks (0)
|

According to Space Politics the Congressional Ares, Orion hearings have been postponed with no new date set

This Boeing presentation has surfaced and has some interesting points about Ares I crew launch vehicle design considerations including concern that lift off loads may be a significant design issue due to the "direct load path between the SRB and the upper stage".

Flight has also heard that despite previous NASA presentations showing that the Ares I first-stage solid rocket booster casings not changing they are now going to have to because of in-flight forces at points along the lengthof the "stick"

NASAWatch.com has found this video of the proposed Ares V Cargo Launch Vehicle launching a space telescope

Flight has published a number of stories about Ares V design options and alternate missions to the lunar outpost flights, including larger fairings for the CaLV, manned missions to near Earth objects and an asteroid deflection mission

Here is some J-2X news from Alabama care of Hobbyspace.com

And here Lockheed Orion development team member and Mars Blog blogger T. L. James has some harsh words for the Alabama report

0 TrackBacks

Listed below are links to blogs that reference this entry: Hearings postponed, Ares I structural questions, new uses for Ares V and J-2X consternation.

TrackBack URL for this entry: http://www.flightglobal.com/cgi-bin/mt/mt-tb.cgi/13502

Leave a comment

Want a user picture? Get a Gravatar!

Follow This Blog

Hyperbola Friendfeed