Archives

Google Translate

Recent Assets

  • xcor astronautsW445.jpg
  • esa 26 nov press conference.JPG
  • orion drop test vehicle8.jpg
  • orion drop test vehicle7.jpg
  • orion drop test vehicle6.jpg
  • orion drop test vehicle5.jpg
  • orion drop test vehicle4.jpg
  • orion drop test vehicle3.jpg
  • orion drop test vehicle2.jpg
  • orion drop test vehicle1.jpg

NASA cancels Orion parachute weight reduction procurement

| | Comments (0) | TrackBacks (0)
|
NASA Johnson Space Center had had a requirement for "Lightweight Materials for the CEV Parachute Assembly System (CPAS)" that would be "developed, manufactured, and laboratory and flight tested" for use "in the skirt to shoulder region of the main canopies"

orion canopies open.jpg
credit: NASA

This was so CPAS would meet the required "launch weight constraints" and parachute compartment volume but now NASA has decided to cancel that procurement

0 TrackBacks

Listed below are links to blogs that reference this entry: NASA cancels Orion parachute weight reduction procurement.

TrackBack URL for this entry: http://www.flightglobal.com/cgi-bin/mt/mt-tb.cgi/33941

Leave a comment

Technorati

Technorati search

» Blogs that link here