Archives

Recent Assets

  • 8083138382_e07f5345af_ov2.jpg
  • hermes 450 560.jpg
  • AIM_120.jpg
  • ZM136.jpg
  • GR4 560.jpg
  • Hurry 560.jpg
  • fotoLo154.jpg
  • T-XdraftKPPs.jpg
  • 090304-F-3352w-044.jpg
  • vulcan 560.jpg

EADS already counting its KC-X chickens?

Proposals for the KC-X contract are not due until July 8, contract award is not scheduled until October-November and the political fall-out no matter who wins hasn't even begun to start.

But EADS North America may already be hiring production staff for the KC-45 tanker in anticipation of a contract award.

A job advertisement for an Air Vehicle Director posted on May 14 doesn't specifically say it's for KC-X. But the job description says it involves converting "a civil aircraft into a missionized military aircraft". The job also will start at EADS NA's headquarters in Arlington, Virginia, then shift permanently to Mobile, Alabama. If that's not about KC-X, our friends at EADS have some very interesting explaining to do.

In case anybody wants to apply, here are the job duties:

·         Staff, lead and manage a robust Air Vehicle Team
·         Develop and deploy Air Vehicle management and engineering processes, procedures, techniques and tools to ensure comprehensive practices for the entire product life cycle
·         Advise senior management on progress, issues, and impediments to Air Vehicle development/production
·         Assist the Systems Engineering Integration and Test (SEIT) Team in the conduct of trade studies to define implementations and alternatives that account for all program variables
·         Anticipate program disruptive events and redeploy resources as necessary to minimize impact
·         Coordinate with other program organizations and ensure that the various organizations remain coordinated
·         Ensure that overall customer requirements are met within cost and schedule constraints
·         Establish, manage and coordinate a modification capability for the missionization production activities

0 TrackBacks

Listed below are links to blogs that reference this entry: EADS already counting its KC-X chickens?.

TrackBack URL for this entry: http://www.flightglobal.com/cgi-bin/mt/mt-tb.cgi/152120