Top News on Stephen Trimble

  • General aviation market sends mixed signals in Q2


    The market sent mixed signals to the general and business aviation sector in the second quarter, as the total number of fixed-wing aircraft deliveries declined but overall sales inched higher compared to the same period last year, the General Aviation Manufacturers Association (GAMA) announced on 31 July.


  • Other News for Stephen Trimble

  • General aviation market sends mixed signals in Q2


    The market sent mixed signals to the general and business aviation sector in the second quarter, as the total number ...


  • CSeries flight test speeds up as production plans slow down


    ​Bombardier’s new management team expects the recovery from the CSeries programme’s long sales drought to occur slowly...


  • Bombardier announces two-year Global 7000 delay


    ​Bombardier has announced a two-year delay for the entry into service of the Global 7000 business jet, blaming...


  • News Listings for Stephen Trimble

  • General aviation market sends mixed signals in Q2

    News | 31 Jul 2015 20:06 | Stephen Trimble

    The market sent mixed signals to the general and business aviation sector in the second quarter, as the total number of fixed-wing aircraft deliveries declined but overall sales inched higher compared to the same period last year, the General Aviation Manufacturers Association (GAMA) announced on 31 July.http://www.flightglobal.com/news/articles/General-aviation-market-sends-mixed-signals-in-Q2-415289/
  • ANALYSIS: ​Why Airbus has set up shop in Silicon Valley

    News | 31 Jul 2015 15:00 | Stephen Trimble

    If failing correctly can be considered a strategic business skill, Silicon Valley may have a lot to teach the aerospace industry – most recently Airbus Group.http://www.flightglobal.com/news/articles/ANALYSIS-Why-Airbus-has-set-up-shop-in-Silicon-Valley-415126/
  • CSeries flight test speeds up as production plans slow down

    News | 30 Jul 2015 20:50 | Stephen Trimble

    ​Bombardier’s new management team expects the recovery from the CSeries programme’s long sales drought to occur slowly over three to five years, but the impact will be softened by recent plans to adopt a more gradual production ramp-up of the CS100 and CS300.http://www.flightglobal.com/news/articles/CSeries-flight-test-speeds-up-as-production-plans-slow-down-415228/
  • Bombardier announces two-year Global 7000 delay

    News | 30 Jul 2015 12:35 | Stephen Trimble

    ​Bombardier has announced a two-year delay for the entry into service of the Global 7000 business jet, blaming unspecified development “challenges”.http://www.flightglobal.com/news/articles/Bombardier-announces-two-year-Global-7000-delay-415200/
  • Embraer announces two-year delay for KC-390

    News | 30 Jul 2015 10:36 | Stephen Trimble

    ​Embraer has delayed the certification for the KC-390 tanker-transport to the second half of 2017 and entry into service in 2018.http://www.flightglobal.com/news/articles/Embraer-announces-two-year-delay-for-KC-390-415195/
  • Airbus starts design of hybrid-electric 100-seater

    News | 29 Jul 2015 08:56 | Stephen Trimble

    ​In less than two decades, Airbus’s concept for the VoltAir E-Fan could spawn a new family of 100-seat regional airliners with a hybrid-electric propulsion system anchored by diesel engines sending 6MW of power to a row of electric thrusters.http://www.flightglobal.com/news/articles/Airbus-starts-design-of-hybrid-electric-100-seater-415131/