Boeing completes 787 high-pressure test

  Stephen Trimble Washington DC
05:00 6 Oct 2008 
Source:
This story is sourced from Flight International
Subscribe today »

Boeing completed the first of three major tests for the 787 static airframe on 27 September required to clear the aircraft to make its first flight. The high-pressure test in Everett, which validated that the airframe can survive a massive spike in cabin pressure, saw cabin pressure slowly over a 2h period to 150% of the maximum service load.

 787 static frame test
 © Boeing