FlightGlobal.com
Home
Premium
Archive
Video
Images
Forum
Atlas
Blogs
Jobs
Shop
RSS
Email Newsletters
You are in:
Home
Aviation History
1996
1996 - 0008.PDF
J=J-lLiLJiJ53 Court rules in favour of A-12 companies AUS JUDGE HAS ruled that General Dynamics (GD) and McDonnell Douglas (MDC) did not conceal from the US De partment of Defense (DoD) prob lems with the A-12 attack aircraft. The ruling clears the way for a set tlement of the companies' lawsuit arising from the 1991 cancellation of the $52 billion programme to produce a stealthy successor to the US Navy's Grumman A-6 attack aircraft. US Claims Court Judge Robert Hodges has ruled that the DoD failed to prove its claim that the contractors withheld information on problems with the A-12 pro gramme, which was over budget and behind schedule when it was cancelled without a single aircraft being completed. GD and MDC are fighting the DoD's decision to terminate the programme for default, putting the blame for the cancellation on the contractors and preventing them from receiving compensation. The companies claim that they are owed more than $2 billion. Hodges says that it was "mani festly clear" that the US Gov ernment "cannot prove its case". Evidence of concealment presented by the DoD was "discredited on cross-examination", he rules. The judge will rule on compensation and damages in 1996. Estimates of potential settlements range from $1 billion to $3 billion. • NEWS IN BRIEF • ANGOLA ACCIDENT A Trans Service Airlift Lockheed Electra has crashed in Lunda Norte province, Angola, killing 139 of the 144 people on board. The Kinshasa, Zaire- based airline had been char tered by the Angolan political movement UNITA to operate the flight from Jamba, Lunda Norte, on 18 December. UK and USA sign JAST MoU DOUGLAS BARRIE/LONDON GRAHAM WARWICK/ATLANTA THE UK AND USA signed a memorandum of understand ing (MoU) on 20 December com mitting the UK to take part in the four-year concept demonstration phase of the Joint Advanced Strike Technology (JAST) programme to develop a future strike fighter. Under the MoU, the UK will contribute £130 million ($200 mil lion), some 10% of the concept demonstration phase costs, to the project. The UK Ministry of Defence (MoD) is hoping that the advanced short take-off and verti cal landing (ASTOVL) JAST will meet the Royal Navy's British Aerospace Sea Harrier FA/2 replacement needs. The MoD was forced to renego tiate the MoU covering the F/A2 replacement when the US Department of Defense (DoD) merged the JAST and A$TOVL programmes. The MoD says: "Our involve ment is limited to the concept demonstrator phase. Following this we will then decide whether to go ahead with the engineering, manufacturing and development phase of the JAST programme." While the MoD would not dis cuss the MoU in detail, it confirms that it "...allows for UK companies to compete for work within the JAST programme". This covers both the ASTOVL and conventional vari ants. Both British Aerospace, teamed with McDonnell Douglas, and Rolls- Royce stand to benefit from the JAST pro gramme. The DoD has also awarded Pratt & Whitney a $30 million contract to support the JAST concept-demon stration phase, sched uled to begin in October. All three contractors working on JAST designs have based their proposed concept-demonstrator aircraft around P&W's Fl 19 engine, under development for the Lockheed Martin/B oeing F-2 2. Under its 11-month contract, P&W will provide preliminary- design support and procure long- lead items for engines required by the JAST teams. The plans call for two concept- demonstration contracts, under which competing teams will build conventional take-off and landing and short take-off and vertical landing (STOVL) variants of their designs. The three JAST contractors are pursuing different STOVL prop ulsion concepts (Flight Inter national, 13-19 December, 1995, UK JAST involvement lifts off P26). Boeing is working on a direct-lift design, using a refanned Fl 19 with two-dimensional thrust- vectoring propulsion nozzle and swivelling, retractable, lift nozzles. Lockheed Martin's design uses a lift fan, shaft driven by a modified F119 fitted with a vectoring lift/cruise nozzle. MDC's lift-plus- lift/cruise concept combines an unmodified Fl 19, with separate lift and cruise nozzles, with a General Electric/Allison lift engine. The GE/Allison team has a received a $7 million contract to study derivatives of GE's Fl 10 and F120 engines as alternatives to the Fl 19 for use in the production Joint $trike Fighter aircraft expect ed to emerge from the JAST con cept-demonstration programme.Q Boeing optimistic about GE-powered 777s GRAHAM WARWICK/ATLANTA BOEING DELIVERED three General Electric GE90-pow- ered 777s by the end of 1995, after GE's proposed increase of the fan- blade-tip clearances had been approved by the US Federal Aviation Administration Flight International, 20 December, 1995-2 January, P4). Efforts continued to determine the cause of an engine surge. The aircraft affected are two for British Airways and one for China Southern Airlines. GE sought US Federal Aviation Administration permission to increase blade-tip clearance by 1.3 mm on engines ready for deliv ery, after the 3 December surge (during high-angle-of-attack flight testing) was attributed to heavy rubbing of the composite fan blades against the fan-case abradable seal. As of mid-December, GE had been unable to replicate the rub problem in ground tests of the fan and fan-case module removed from the affected engine. The manufac turer believes that the surge may have been a one-time event unique to that module. The module was replaced and Boeing made a "flawless" accep tance flight with the aircraft, BA's third 777. GE nevertheless planned to increase blade-tip clear ances on GE90s powering this and two other aircraft, BA's second 777 and China Southern's first, as a precaution and to allow their deliv ery by the end of 1995. The FAA's Reliability Assessment Board will decide in mid-January whether the GE90 is ready to proceed into 1,000-cycle extended-range twinjet-operations testing. GE says that BA has logged 1,000 engine hours in the first 50 flights of its first 777 "with zero problems". • 6 FLIGHT INTERNATIONAL 3 - 9 January 1996
Sign up to
Flight Digital Magazine
Flight Print Magazine
Airline Business Magazine
E-newsletters
RSS
Events