On 16 November, the first Bombardier CS300 was glimpsed outside the factory for the first time. The stretched CSeries model is still within days or weeks of entering pre-flight taxi tests, but emerged to perform a battery of checks on its fuel flow system.
You have reached your limit of free articles for this period. Register for a FREE account to read this article and benefit from: