The delayed US certification of the McDonnell Douglas Helicopter Systems (MDHS) MD600N is expected early in May. MDHS has raised the rotor minimum speed and moved the tail-thruster exit to on top of the tailboom to eliminate blade strikes on the boom caused by rotor droop during control reversals at low RPM, which resulted in flight-test accidents.

 

Source: Flight International